Own product
MyPetCerts
My own SaaS, live since 2016. Its Grails 6.2.3 / Java 17 rebuild is in final cutover prep, with the go-live data migration rehearsed on a production copy: ~17 min, zero schema failures.
Live since 2016; Grails 6.2.3 v2 in final cutover prep